Wireless Refresh Project

Project Overview

The Wireless Refresh Project will modernize RIT’s wireless network infrastructure to ensure it continues to meet the needs of students, faculty, and staff over the next decade. Over an 18‑month period, the project will replace more than 8,000 wireless access points across campus and upgrade the network to Wi‑Fi 7.

This effort represents a large‑scale refresh of the campus wireless environment, designed to maintain a reliable, secure, and scalable foundation for academic, research, and administrative activities. The project focuses on infrastructure modernization to support current demand and prepare the network for future growth.

Benefits

The Wireless Refresh Project will deliver meaningful improvements to the campus experience by strengthening the performance and resilience of RIT’s wireless network.

  • Increased capacity and performance
    The upgraded network will better support the growing number of connected devices and the higher performance expectations of modern hardware.

  • Improved reliability across campus spaces
    Enterprise‑grade wireless connectivity will support learning, research, and campus life in classrooms, laboratories, active learning environments, residence halls, performance venues, and social spaces.

  • Enhanced security and future readiness
    Modern infrastructure and standards will strengthen the security posture of the wireless network while providing a foundation that can evolve with emerging technologies.

  • Support for innovation and quality of life
    By treating wireless connectivity as an enabling component of a modern campus, the project helps sustain academic innovation while improving the day‑to‑day digital experience for students, faculty, and staff.

Project FAQs

We do not anticipate outages, and the work should feel largely invisible to anyone in the area. Users may experience "rolling" service degradation specific to the small area where technicians are actively working. Wireless devices typically roam automatically to a neighboring access point (AP) and connectivity usually remains active. 

Replacing the physical access point (AP) will take about 15-20 minutes; however, it will take up to 30 minutes before the new AP allows devices to reconnect.

Wireless devices typically roam automatically to a neighboring access point (AP) and connectivity usually remains active. 

Users on real-time applications (like Zoom or Teams) might experience a brief glitch or momentary disconnect while their device switches over. During critical presentations occurring during active work windows, we recommend utilizing a wired (Ethernet) connection, which will remain wholly unaffected by this maintenance. 

For any data transfers occurring during active work windows, we recommend utilizing a wired (Ethernet) connection, which will remain unaffected by this maintenance.

Wired (Ethernet) connection will remain wholly unaffected by this upgrade. 

The work will be completed by a vendor partner with expertise in this area who participated in the pilot program.

Please refer to the building schedule below. We will do our best to keep the dates as accurate as possible but know that the schedule is tentative and dependent on contractor schedules, access needs, and other factors.

Yes.  ITS has successfully utilized this upgrade model during our pilot in the Wallace Library and Ross Hall with minimal disruption.

Because this is a large, campus-wide initiative involving more than 8,000 access points, work must continue consistently throughout the full 18‑month timeframe. We will work closely with campus partners to carry out deployments during active teaching weeks in a way that minimizes disruption while keeping the project moving forward.

 

We will be arranging meetings with building coordinators to review site access requirements, confirm scheduling constraints, and establish clear communication throughout the project. If you are a building or floor coordinator, please reach out to the team at wirelessrefresh@rit.edu to get involved or report an issue. 

If you experience connectivity issues, please follow these WiFi troubleshooting steps, or reach out to the RSC for more assistance

Building Schedule

The schedule below is tentative and will be updated as the project progresses. Search below to see the status of your building.

Building Number

Abbreviation

Building Name

Tentative Start Date

001 EAS George Eastman Hall Summer 2026
002 RIA Frank Ritter Arena Completed
003 CLK, CPC George H. Clark Gymnasium, Campus Center Completed
004 SAU Student Alumni Union 03/11/2026
005 WAL Wallace Library Completed
006 LBR Liberal Arts Hall 03/19/2026
007A BOO, SAN, VIG, UNI James E. Booth Hall, Sands Family Studios, Vignelli Center for Design Studies, University Gallery 04/02/2026
007B GAN Frank E. Gannett Hall 04/14/2026
008 GOS Thomas Gosnell Hall Fall 2026
009 GLE James E. Gleason Hall Fall 2026
010 ROS Lewis P. Ross Hall Fall 2026
011 SHD Student Hall for Exploration and Development Completed
012 LOW Max Lowenthal Hall Fall 2026
013 ORN Orange Hall Fall 2026
014 HLC Hugh L. Carey Hall Fall 2026
015 MON Monroe Hall Fall 2026
016 SMT Schmitt Interfaith Center Fall 2026
017 ENG Engineering Hall Fall 2026
018 COL Munsell Color Science Laboratory Fall 2026
020 RKA Riverknoll Apartments Summer 2027
021 STA Thomas Feary Judson Jr. Stadium Completed
022 POL Gene Polisseni Center Summer 2026
023 HAC, AUG Hale-Andrews Student Life Center, August Center Summer 2026
024 GOR Gordon Field House & Activities Center Summer 2026
025 GWH Grace Watson Hall Fall 2026
027 BHA Frances Baker Hall A Summer 2026
028 RHA Residence Hall A Summer 2026
029 BHB Frances Baker Hall B Summer 2026
030 RHB Residence Hall B Summer 2026
031 CHA Eugene Colby Hall A Summer 2026
032 RHC Residence Hall C Summer 2026
033 CHB Eugene Colby Hall B Summer 2026
035 KGH Kate Gleason Hall Summer 2026
037 CHC Eugene Colby Hall C Summer 2026
039 FHA Helen Fish Hall (A) Summer 2026
041 FHB Helen Fish Hall (B) Summer 2026
043 DSP Fredericka Douglass Sprague Perry Hall Summer 2026
047 SHH Sol Heumann Hall Summer 2026
049 CGH Carlton Gibson Hall Summer 2026
050A MEH Mark Ellingson Hall Summer 2026
050B PTH Peter Peterson Hall Summer 2026
050C RHD Residence Hall D Summer 2026
053 RSC Rosica Hall Fall 2026
055 CSD Communication Service for the Deaf Student Development Center Fall 2026
060 LBJ Lyndon Baines Johnson Hall Fall 2026
070 GOL, CYB Golisano Hall, Cybersecurity Hall Fall 2026
071 MSS MAGIC Spell Studios Summer 2026
073 INS Institute Hall Fall 2026
074 LAC Laboratory for Applied Computing Fall 2026
075 CBT Center for Bioscience Education & Technology Fall 2026
076 CAR Chester F. Carlson Center for Imaging Science Fall 2026
077 BLC Bausch & Lomb Center Fall 2026
078 SLA Louise Slaughter Hall Fall 2026
080 RED Red Barn Fall 2026
081 SUS Sustainability Institute Hall Fall 2026
082 ENT Engineering Technology Hall Fall 2026
083 PAC Performing Arts Center Summer 2026
084 RES Research Building Completed
086 BRN Brown Hall Spring 2027
087 USC, SIH University Services Center, Student Innovation Hall Spring 2027
089 CRS Crossroads Spring 2027
090 PGA Perkins Green Apartments Summer 2027
093 OBS Observatory Spring 2027
096 VRB Vehicle Repair Building Spring 2027
099 FMS Facilities Management Services Spring 2027
100 LH Liberty Hill Summer 2026
150 TPD 125 Tech Park Drive Spring 2027
232 LOB Joseph M. Lobozzo Alumni House Summer 2026
300-330 UCS University Commons Suites Summer 2027
400 GVP Global Village Plaza Summer 2027
403 GVC Global Village Way C Summer 2027
404 GVD Global Village Way D Summer 2027
405 GVE Global Village Way E Summer 2027
500 ICC RIT Inn & Conference Center Summer 2027
604 GHA Greek House A - Zeta Tau Alpha Summer 2027
608 GHB Greek House B - Delta Phi Epsilon Summer 2027
612 GHC Greek House C - Alpha Sigma Alpha Summer 2027
616 GHD Greek House D - Phi Kappa Psi Summer 2027
620 GHE Greek House E - Alpha Xi Delta Summer 2027
624 GHF Greek House F - Pi Kappa Phi Summer 2027
800 PPD 100 Park Point Drive Summer 2027
820 JEF Jefferson Place Summer 2027
905 905 Annex V Spring 2027
906 906 Annex VI Spring 2027
907 907 Annex VII Spring 2027
908 908 Annex VIII Spring 2027
909 909 Annex IX Spring 2027
995 LEL Leenhouts Lodge at the Tait Preserve Summer 2027
998 FNK 40 Franklin Street Spring 2027
111 WEL Welcome Center Summer 2026

Questions & Feedback

The Project Team welcomes any questions, feedback or comments you wish to share. Please reach out to our project support team at wirelessrefresh@rit.edu.