Vendor/Contractor Information

Design and Construction Guidelines

[June 2019] The RIT Design and Construction Guidelines have been formatted with respect to CSI 2016 MasterFormat.  The Table of Contents, each Division header, and select numbers  below contain a hyperlink to a downloadable PDF file.  These files, collectively, make up the RIT Design and Construction Guidelines.

 

Table of Contents

 

Division 00 – Procurement and Contracting Requirements                                    June 2019

00 43 00                                   Consultant Invoice Summary - AIA

00 45 13                                   Contractor's Qualification Form

00 45 13                                   Contractor's Requalification Form

00 65 00                                   Instructions for Payment/Lien Releases

00 73 16                                   FM Global Plan Review Guidelines

00 73 19                                   Health and Safety Requirements

00 73 19                                   Hot Work Permit Application

00 73 43                                   Prevailing Wages

 

Division 01 – General Requirements                                                                          June 2019

01 31 19                                   Meetings

01 33 23                                   CAD Specifications and Deliverables

01 33 29                                   Sustainable Design Reporting

01 41 19                                   Contractor Rules

01 50 00                                   Temporary Facilities and Controls

01 73 29                                   Cutting and Patching

01 81 13                                   Climate Action Plan

01 84 00                                   Space Definitions and Guidelines

01 89 00                                   Site and Parking Lot Design Standards

 

Division 02 – Existing Conditions                                                                               June 2019

02 26 00                                   Asbestos Containing Materials Reference

 

Division 03 – Concrete                                                                                                 June 2019

03 01 00                                   Maintenance of Concrete

 

Division 04 – Masonry                                                                                                  June 2019

04 21 13                                   Brick Masonry

 

Division 05 – Metals                                                                                                      June 2019

05 05 13                                   Shop-Applied Coatings for Metal

 

Division 07 – Thermal and Moisture Protection                                                        June 2019

07 20 00                                   Thermal Protection

07 72 00                                   Roof Accessories

07 80 00                                   Fire and Smoke Protection

 

Division 08 – Openings                                                                                                 June 2019

08 11 00                                   Metal Doors and Frames

08 42 00                                   Entrances

08 44 00                                   Curtain Wall and Glazed Assemblies

08 71 00                                   Hardware

08 79 13                                   Key Storage Equipment

08 80 00                                   Glazing

 

Division 09 – Finishes                                                                                                June 2019

09 06 00                                   Schedules for Finishes

09 30 00                                   Tiling

09 51 00                                   Acoustical Ceilings

09 61 00                                   Common Work Results for Flooring

09 62 00                                   Textile Composite Flooring

09 64 00                                   Wood Flooring

09 65 13                                   Resilient Base and Accessories

09 65 16                                   Resilient Sheet Flooring

09 65 19                                   Resilient Tile Flooring

09 67 00                                   Seamless Flooring

09 68 00                                   Carpeting

09 91 23                                   Interior Painting

 

Division 10 – Specialties                                                                                               June 2019

10 14 00                                   Signage

10 14 19                                   Exterior Building Signs

10 21 13                                   Toilet Compartments

10 28 13                                   Toilet Accessories

10 44 00                                   Fire Protection Specialties

10 56 16                                   Fabricated Wood Storage Shelving

10 73 00                                   Bike Shelters

10 73 00                                   Protective Covers

 

Division 11 – Equipment                                                                                              June 2019

11 12 00                                   Parking Control Equipment

11 52 00                                   Audio/Visual Equipment

11 82 13                                   Solid Waste Bins

 

Division 12 – Furnishings                                                                                             June 2019

12 2100                                    Window Blinds

12 48 13                                   Entrance Floor Mats

12 48 23                                   Entrance Grids

12 50 00                                   Furniture

12 51 00                                   Office Furniture and Modular Office Systems

12 54 00                                   Dining Furniture

12 56 00                                   Classroom and Class Lab Furniture

12 58 00                                   Residential Furniture

12 80 00                                   Mechanical Room Furnishings

12 93 13                                   Bike Racks

12 93 43                                   Site Seating and Tables

 

Division 14 – Conveying Equipment                                                                            June 2019

14 01 00                                   Operation and Maintenance Requirements

14 05 00                                   Common Work Results for Conveying Equipment

14 50 00                                   Documentation

 

Division 21 – Fire Suppression                                                                                     June 2019

21 05 00                                Common Work Results for Fire Sprinkler System

21 05 53                                Identification for Fire Sprinkler Piping and Equipment

21 08 00                                Commissioning

21 13 13                                Wet-Pipe Sprinkler Systems

21 13 16                                Dry-Pipe Sprinkler System

21 30 00                                Fire Pumps

 

Division 22 – Plumbing                                                                                                   June 2019

22 05 00                                   Common Work Results for Plumbing

22 05 19                                   Meters and Gauges

22 05 23                                   General-Duty Valves

22 05 29                                   Hangers and Supports

22 05 53                                   Identification for Plumbing Equipment and Piping

22 07 19                                   Plumbing Insulation

22 11 16                                   Domestic Water Piping

22 11 23                                   Domestic Water Pumps

22 13 16                                   Sanitary Waste and Vent Piping

22 14 13                                   Facility Storm Drainage Piping

22 16 23                                   Natural Gas Piping

22 42 00                                   Plumbing Equipment and Fixtures

22 45 00                                   Emergency Plumbing Fixtures

22 47 13                                   Drinking Fountains

 

Division 23 – Heating, Ventilating, and Air Conditioning                                           June 2019

23 01 00                                   Operation and Maintenance Requirements

23 05 19                                   Meters and Gauges

23 05 23                                   General-Duty Valves

23 05 29                                   Hangers and Supports

23 05 53                                   Identification for HVAC Equipment and Piping

23 05 93                                   Testing, Adjusting, and Balancing

23 07 00                                   HVAC Insulation

23 09 00                                   Instrumentation and Control for HVAC

23 09 23                                   DDC Systems for HVAC

23 09 13                                   Control Valves

23 21 00                                   Hydronic Piping and Pumps

23 23 00                                   Refrigerant Piping

23 31 00                                   HVAC Air Distribution

23 34 00                                   HVAC Fans

23 36 16                                   Variable-Air Volume Units

23 40 00                                   HVAC Air Cleaning Devices (Filters)

23 60 00                                   Central Cooling Equipment

23 74 00                                   Roof-Mounted Equipment

23 81 46                                   Heat Pumps

23 82 00                                   Convection Heating and Cooling Units

 

Division 26 – Electrical                                                                                                   June 2019

26 01 00                                   Operation and Maintenance of Electrical Systems

26 05 00                                   Common Work Results for Electrical

26 10 00                                   Medium-Voltage Electrical Distribution

26 20 00                                   Low-Voltage Electrical Distribution

26 24 16                                   Panelboards

26 27 13                                   Electricity Metering

26 29 23                                   Variable Frequency Motor Controllers (VSD)

26 50 00                                   Lighting

26 55 00                                   Special Purpose Lighting

 

Division 27 – Communications                                                                                     June 2019

27 05 00                                   Basic Communication Requirements

27 05 00                                   Communications Spaces

27 05 00                                   Common Work Results

27 13 00                                   Backbone Cabling Requirements

27 15 00                                   Horizontal Cabling Requirements

 

Division 28 – Security, Fire Detection, and Alarm                                                     June 2019

28 15 00                                    Access Control Hardware

28 20 00                                    Video Surveillance

28 30 00                                    Security Detection, Alarm, Monitoring

28 46 00                                    Fire Detection and Alarm

28 46 10                                    Detection and Initiation

28 46 21                                    Addressable Fire Alarm Systems

28 46 26                                    Fire Alarm Notification Appliances

 

Division 32 – Exterior Improvements                                                                           June 2019

32 05 13                                   Soils for Exterior Improvements

32 12 16                                   Asphalt Paving

32 13 13                                   Concrete Paving

32 14 13                                   Precast Concrete Pavers

32 16 40                                   Curbing

32 17 23                                   Pavement Markings

32 35 00                                   Screening Devices

32 93 43                                   Plants

32 93 43                                   Trees

 

Division 33 – Utilities                                                                                                    June 2019

33 05 00                                   Restoration Standards for Underground Utilities

33 05 13                                   Manholes

33 10 00                                   Water Utilities

33 30 00                                   Sanitary Sewer Utilities

33 40 00                                   Storm Drainage Utilities

33 44 16                                   Trench Drains

33 44 31                                   Catch Basins

33 51 00                                   Natural Gas Piping

33 70 00                                   Electrical Utilities

33 82 00                                   Communications Transmissions and Distribution

 

Related Documents

Procurement and Contracting Requirements

CAD Template Zip

NYSERDA Process (dated 09/2012) - Reference 01 33 29

FM Global Plan Review Guidlines for RIT (2017 version) - Reference 00 73 19

 

Notes

1. All documents previously-located in the Standard Invoice Forms and Miscellaneous sections have been relocated to the appropriate Divisions above.

2. All documents previously-located in the Guidelines section have been updated and incorporated in the documents above.  Previous versions of said documents will remain below until September 1, 2019 for reference: these documents are no longer valid.  Documents include the following,

Design Guidelines (dated 06/23/2016) - Updated and separated into CSI divisions

Sprinkler System Guidelines (dated 03/03/2017) - Converted to Division 21

Communications Cabling Guidelines (dated 02/09/2017) - Converted to Division 27

Fire Alarm System Guidelines (dated 03/03/2017) - Converted to Division 28

Pipe Label and Valve Tag Guidelines (dated 03/01/2013) - Incorporated into Divisions 22 and 23

Building Management System Specifications - Converted to 23 09 00

CAD Specifications - Converted to 01 33 23